HMF-MAK Training – Primary (Stage by stage SLD)
About Course
OBJECTIVES:
• Develop energization sequences for new substations or extensions.
• Plan to run arrangements for normal,emergency, and maintenance conditions.
• Ensure safety during commissioning.
KEY TOPICS:
• Phased energization (cable, transformer,busbar, feeder).
• Switching sequences for commissioning.
• Normal, emergency, and maintenance running arrangements.
• N-1 contingency planning.
• Isolation and earthing requirements during stages.
PRACTICAL FOCUS:
• Create energization plan for 132/33kV GIS substation (8 stages).
• Exercise: Determine running arrangement for N-1 contingency.
• Case study: Energization incident due to a missing step.
SUGGESTED DIAGRAMS:
• Stage-by-stage energization flowchart.
• Running arrangement SLDs (normal, emergency, maintenance).
• Switching sequence table.
KEY TAKEAWAYS:
• Ability to plan safe and logical energization.
• Understanding of operational flexibility.
STANDARDS & REFERENCES:
• System Operator (NG/SSEN) energization codes.
• Client commissioning procedures.
CERTIFICATION & DELIVERY:
• Certificate of Completion awarded.
• Delivery Mode: Online (On-demand).
PREREQUISITES:
• Familiarity with SLD and switching devices.
Course Content
STAGE BY STAGE ENERGIZATION PLAN & RUNNING ARRANGEMENTS
-
STAGE BY STAGE ENERGIZATION PLAN & RUNNING ARRANGEMENTS